Specialist subcontractor
‘Specialist contractor’ is a very broad term that describes a contractor appointed to carry out activities in the development of a built asset that involve specialist construction knowledge and skills. This is as opposed to a ‘general contractor’ who will typically have a range of general construction knowledge and skills.
Typically, general contractors are tier 1, main contractors, working directly for the employer and are in overall charge of construction works. Specialist contractors are generally tier 2 subcontractors working for the main contractor to carry out a specialist part of the construction works. For this reason, they are sometimes referred to as ‘specialist subcontractors’.
However, the construction supply chain is increasingly complex and varied, and so a specialist contractor might be employed directly by an employer (for example to remove asbestos from a building). Similarly, a general contractor might be employed by a main contractor to carry out general construction works on their behalf and so might be referred to as a ‘subcontractor’.
To further complicate the supply chain, specialist subcontractors may have their own suppliers of materials, labour and components, and in some cases, these suppliers may be larger, more general contractors, than the specialist contractor.
The even wider term 'specialist' may be used to refer to specialist contractors, specialist suppliers (such as suppliers of specialist materials or plant) or specialist consultants (such as specialist designers).
The definition of what constitutes ‘specialist’ is not clear, however, examples of areas that might involve a specialist subcontractor could include:
- Cladding and glazing.
- Specialist finishes.
- Building services.
- Information and communications technology.
- Lifts and escalators.
- Fire protection.
- Drilling.
- Piling.
- Flooring.
In addition to providing construction services, increasingly, specialist subcontractors undertake aspects of technical design. Earlier engagement with specialist subcontractors is also possible, and it is common during the ‘developed design’ or ‘detailed design’ stage for the project team to consult with specialist subcontractors to begin to address specific aspects of the design.
Early design input can be secured from specialist subcontractors before the supply contract has been agreed by:
- Informal agreement.
- Writing a closed specification that could only be satisfied by the specialist subcontractor.
- A two-stage tender process where the specialist subcontractor's design services are procured in the first stage along with agreed rates, overheads and profit for the products or services to be supplied in the second stage.
It is important that appointment documents make it clear who has responsibility and liability for different aspects of the design at different stages of the project and the level of detail that they will be expected to produce. Where building information modelling (BIM) is being used, handover of an element of the design to a specialist may require a 'change of ownership' procedure for those parts of the model.
A design co-ordinator may be appointed with specific responsibility for co-ordinating and integrating specialist subcontractors' designs.
The National Specialist Contractors’ Council (NSCC) brings together specialist trade organisations representing businesses engaged in planning, design, construction, refurbishment, and maintenance.
[edit] Related articles on Designing Buildings
- Back-to-back provisions in construction contacts.
- Collaborative practices.
- Contractor.
- Domestic sub-contractor.
- Named specialist work.
- Named sub-contractor.
- Nominated sub-contractor.
- Procurement route.
- SPC 2000.
- Specialist contractors.
- Sub-consultant.
- Trade contractor.
- Works contractor.
[edit] External references
- Gray, C and Flanagan, R (1989) The changing role of specialist and trade contractors. Ascot: Chartered Institute of Building.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.