‘Specialist contractor’ is a very broad term that describes a contractor appointed to carry out activities in the development of a built asset that involve specialist construction knowledge and skills. This is as opposed to a ‘general contractor’ who will typically have a range of general construction knowledge and skills.
Typically, general contractors are tier 1, main contractors, working directly for the employer and are in overall charge of construction works. Specialist contractors are generally tier 2 subcontractors working for the main contractor to carry out a specialist part of the construction works. For this reason, they are sometimes referred to as ‘specialist subcontractors’.
However, the construction supply chain is increasingly complex and varied, and so a specialist contractor might be employed directly by an employer (for example to remove asbestos from a building). Similarly, a general contractor might be employed by a main contractor to carry out general construction works on their behalf and so might be referred to as a ‘subcontractor’.
To further complicate the supply chain, specialist subcontractors may have their own suppliers of materials, labour and components, and in some cases, these suppliers may be larger, more general contractors, than the specialist contractor.
The even wider term 'specialist' may be used to refer to specialist contractors, specialist suppliers (such as suppliers of specialist materials or plant) or specialist consultants (such as specialist designers).
The definition of what constitutes ‘specialist’ is not clear, however, examples of areas that might involve a specialist subcontractor could include:
- Cladding and glazing.
- Specialist finishes.
- Building services.
- Information and communications technology.
- Lifts and escalators.
- Fire protection.
- Drilling.
- Piling.
- Flooring.
In addition to providing construction services, increasingly, specialist subcontractors undertake aspects of technical design. Earlier engagement with specialist subcontractors is also possible, and it is common during the ‘developed design’ or ‘detailed design’ stage for the project team to consult with specialist subcontractors to begin to address specific aspects of the design.
Early design input can be secured from specialist subcontractors before the supply contract has been agreed by:
- Informal agreement.
- Writing a closed specification that could only be satisfied by the specialist subcontractor.
- A two-stage tender process where the specialist subcontractor's design services are procured in the first stage along with agreed rates, overheads and profit for the products or services to be supplied in the second stage.
It is important that appointment documents make it clear who has responsibility and liability for different aspects of the design at different stages of the project and the level of detail that they will be expected to produce. Where building information modelling (BIM) is being used, handover of an element of the design to a specialist may require a 'change of ownership' procedure for those parts of the model.
A design co-ordinator may be appointed with specific responsibility for co-ordinating and integrating specialist subcontractors' designs.
The National Specialist Contractors’ Council (NSCC) brings together specialist trade organisations representing businesses engaged in planning, design, construction, refurbishment, and maintenance.
[edit] Related articles on Designing Buildings
- Back-to-back provisions in construction contacts.
- Collaborative practices.
- Contractor.
- Domestic sub-contractor.
- Named specialist work.
- Named sub-contractor.
- Nominated sub-contractor.
- Procurement route.
- SPC 2000.
- Specialist contractors.
- Sub-consultant.
- Trade contractor.
- Works contractor.
[edit] External references
- Gray, C and Flanagan, R (1989) The changing role of specialist and trade contractors. Ascot: Chartered Institute of Building.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.